Lead Time on PO - Calculation Direction
Maybe my screenshot is misleading.
The actual order date is 4/5/2025 on the header and requested receipt date is blank
When I add the item on the line that has a 5D lead time, the system does a backward calculation of the line order date and sets it as 3/31/2025
It doesn't do a forward calculation of the expected receipt date based on the order date