We don’t have the licensing for Job Scheduling, but AX 2009 still creates JmgJobTable jobs for the purpose of time registration. One of my end users recently reported a number of JmgJobTable jobs as finished. I was feeling pretty confident about using the form "Shop Floor Control > Inquiries > Job status > Production status" to cancel the job finished. When I did it the function updated the JmgStampTrans (the transferred registration) so that it did not mark the job finished, HOWEVER, it did not mark the JmgJobTable as unfinished. This is a bit surprising. It would be very easy for me to write an X++ job or something to directly change the status on the JmgJobTable. I don't want to though. I feel like there really should be a way to do this in the client.
How do you reset the JmgJobTable records for setup and process back to unfinished in the client? Do I need to customize AX 2009 to make this available?
*This post is locked for comments
I have the same question (0)