I have a finished good (PG002) which has multiple components as below:
There are some components which are produced (with Production Type "BOM" in its product's configuration).
I run Calculate item price for component FG001 and FG002 before I run for the final product (PG002).
I then tried to run Calculate item price for PG002 by expecting system calculates FG003 and FG004 with the following setup:
Explosion Mode = Multilevel
I configured the BOM as below.
FG003 has Sub-BOM and Subroute set up.
I still could not get the system to calculate all components (includes the BOM type component). It warned me that FG003 and FG004 does not has item price.
Should Explosion = Multilevel do the job to calculate multi-level BOM components?
Should I run Item price calculation from the lower level, one by one? (this is too manual and tedious)
Thanks!
Hendriato,
PS:
All item price of raw materials are setup correctly
Hello Hendriato,
Have you set the default order type for FG003 and FG004 as Production?
Regards
Dolores