Hello all,
Want to clown/copy the data of live server to the test server. That is all the data should be copied to the test server.
How can i do that.
Thank you
Siddhant Singh
Hello all,
Want to clown/copy the data of live server to the test server. That is all the data should be copied to the test server.
How can i do that.
Thank you
Siddhant Singh
Which Version of AX you are using ?, if it is AX 2012 versions
and your Environments within same domain easiest way to backup and then restore to the test server.
even if your environments are in deterrent domains you can do same thing but you need to manually add users from SQL Table to grant access .
Or Else you can use Test Data Transfer Tool to Export data and then you can use same tool for importing too.
Thanks ,
Amith Prasanna ,
(Please mark answer as verified answer if this solved your issue )
Hi Siddhant,
You can make backups of business data database and modeldatabase from the live server and restore it with the test DB names to test DB server.
Then you would need to update environment-specific data (integrations, e-mails, and so on) in restored DB to be sure that the test server will not start to interact with real business world.
stackoverflow.com/.../ax-2012-restore-production-over-non-production
But make backups first for test DBs to be sure that in case of issues you can restore original DBs.
André Arnaud de Cal... 291,684 Super User 2024 Season 2
Martin Dráb 230,414 Most Valuable Professional
nmaenpaa 101,156