The Start and End flushing principles will automatically consume materials at the beginning or the end of an operation, correct? Therefore if I needed a material for a production order and I didn't want it to be consumed at all, I would need to use the Manual flushing principle? Could I then set the consumption of that material to zero so it wouldn't be consumed?
*This post is locked for comments
I have the same question (0)