I need to add routings to a bill of material. How is this done?
*This post is locked for comments
Carolyn - BOM Materials can be linked to Routed Sequences. This is done to provide a more detailed required date for Materials.
From BOM Entry Screen on the GoTo Menu selection (top rh side of window) should be 'BOM Routing Link'.
Technically in GP Mfg - Routings and BOMs are totally separate and GP does not require them to be 'combined'.
Hope this helps......
This looks like what I need. We also currently have two part numbers 1689 & 1648 of which our membrane part # 0012 is linked to both of them. We are now adding a new silver membrane part #0028 to these two BOM’s so we can run a picklist. The 0012 membrane is already linked to the both of them so I should only link the 0028?
Sounds like you are on the right track..........link the new membrane #0028 to the two part numbers 1689 and 1648.....
If you don't mind me asking - what does your manufacturing company produce? I'm certified on the mfg product and I'm formally a manufacturing/operations person - always curious how the real world is using GP Mfg...........
Good Luck
Hi I appreciate your feedback. I am working with a customer who manufactures healthcare products. I have anither question...
I’ve linked the 0028 to the 1648 & 1689 as far as the routings are concerned. What do I do about 0028’s routings. What do I link it to? Do I reverse the procedure meaning pull up the Routing Link window and enter 0028? If I do that 0028 doesn’t show in the “Routing Name” section.
Under review
Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.
As AI tools become more common, we’re introducing a Responsible AI Use…
We are honored to recognize Abhilash Warrier as our Community Spotlight honoree for…
These are the community rock stars!
Stay up to date on forum activity by subscribing.