I am posting item usage in the job journal to a job and job task.
Does anyone know why BC sometimes post an in and out entry causing 0.00 net impact on the GL. I believe this is the correct way
+inv adjustment
-inventory
- inv adjustment
+inventory
And other times just this
+inv adj
-inventory
causing impact on the gl?
It does not matter if I choose “budget” or “budget and billable” line types.
in both test cases the WIP method is Completed Contract.
The entry it makes seems to be random
Krystal,
This is rather strange. I tested a small Job using the limited information and my entry was + INV ADJ / - INVENTORY. This is what I expected.
Can you reply back with pictures or explain the items more so I can test what you are getting.
Thanks,
Steve