Hi all,
I want to set up the job "Production oders - end" as batch which runs each day. The job should end the orders which have been finished five days ago. This can be done by using e. g. date range in the query.
The problem which I have is that the orders should be postet with the date five days ago too. This field is a field in the table where the selection is shown. I'm not able to use a range or anything like this.
Is there a possibility to do this?
Thanks a lot,
Markus
*This post is locked for comments
I have the same question (0)