I have a partially report as finish for FG in one production order with two batch number that have financially cost.
FG- Batch 01
FG-Batch 02
I created a one production order that consume
RM-Batch01 Cost 100 (Financially batch)
RM-Batch02 Cost 200(Financially batch)
And start quantity 1, consume RM-Batch01 Cost 100, then
Start quantity 1, RM-Batch02 Cost 200
When END the production
Both FG batches will have cost 150.
FG- Batch 01
FG-Batch 02
And when trace FG-Batch01 or FG-Batch02 both will show that consumed both RM Batches.
Can AX specify the cost of RAF based on consumed Picking list
FG- Batch 01 COST 100
FG-Batch 02 COST 200
*This post is locked for comments
I have the same question (0)