If I post an output journal for example run time 20 minutes and setup time 30 minutes, the capacity ledger entry only shows the cost based on the run time.
Is there a way to take the setup time into account too?
Thanks
Dave K.
*This post is locked for comments
I have the same question (0)Look at Manufacturing Setup. I guess you have unmarked Cost Incl. Setup Field. Place a checkmark in this field if you want the NAV automatically includes the setup times in the cost.