Good post from Frank that explains ‘A common misconception is that the cost of an item on a Sales Order that is linked to and being fulfilled by a Purchase Order will reflect the cost of the item(s) received on that PO. This is not how GP works.’
http://gp2themax.blogspot.com/2010/05/gptip42day-item-cost-on-linked-sopo.html

*This post is locked for comments