I have below case. I need to setup production where for first step is prepare semi product in tanks (200l capacity one), one tank = one resource.
All tanks 5 pcs = is one resource group.
Secound operation is packing = one resource , (its ok no issue)
For first operation I was add resource group ( this resource group have 5 resources( tanks)) and I divided resource group on 5.
- 3 tanks, system used resiurce for first 3 taks not use rest tanks for the same production.
- 5 tanks system use all resiurce for goroup,
- 8 tanks system use 5 tanks on first 3h, and 3 tanks on secound 3h