Travel Requisition Reset does not release Budget Encumbrance in Dynamics 365 Finance and Operations

(0) ShareShare
ReportReport
Posted on by 6

Dear team,

Hope all are doing well.

We are experiencing an issue in Dynamics 365 Finance and Operations related to Travel Requisition and Budget Control.

Issue Description:
When a Travel Requisition is submitted and approved, the Budget Control status becomes Confirmed, and the corresponding budget encumbrance is created as expected.

However, when we reset the Travel Requisition back to Draft, the existing encumbrance is not released or reversed. If we modify the amount and submit the requisition again, the system creates a new encumbrance while the previous one remains active. As a result, the budget is reserved twice.

Steps to Reproduce:

  1. Create a Travel Requisition for an amount (for example, 10,000).
  2. Submit the requisition through the workflow.
  3. Approve the requisition.
  4. Verify that the Budget Control status is Confirmed and an encumbrance is created.
  5. Reset the Travel Requisition to Draft.
  6. Change the amount (for example, from 10,000 to 8,000).
  7. Submit and approve the requisition again.

Actual Result:

  • The original encumbrance remains confirmed.
  • A new encumbrance is created for the updated amount.
  • The total reserved budget becomes the sum of both encumbrances.

Expected Result:
When the Travel Requisition is reset to Draft, the previous encumbrance should be released or liquidated before a new encumbrance is created, so that only the current amount remains reserved.

Could you please confirm whether this is the expected product behavior, a known issue, or a product defect? If it is a known issue, please provide the related Hotfix, KB article, or recommended solution.

Environment Details:

  • Product: Dynamics 365 Finance and Operations
  • Application Version: [Installed product version : 10.0.47 (10.0.2527.142)]
  • Budget Control: Enabled

Thank you for your support.

Best regards,

I have the same question (0)
  • Suggested answer
    André Arnaud de Calavon Profile Picture
    306,203 Super User 2026 Season 1 on at
    Hi,
     
    Thanks for your question on the Dynamics 365 community forum. You can check if there is a known issue via the PPAC support page, or if there is an update available.
    If this is not the case, then you can create a ticket with Microsoft Support.

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Season of Sharing Community Challenge Winners!

Congratulations to our community stars!

Women in Power Builds Momentum

Expanding mentorship, skilling, and AI innovation

Congratulations to the May Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Finance | Project Operations, Human Resources, AX, GP, SL

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 473 Super User 2026 Season 1

#2
Subra Profile Picture

Subra 420

#3
Martin Dráb Profile Picture

Martin Dráb 289 Most Valuable Professional

Last 30 days Overall leaderboard

Product updates

Dynamics 365 release plans