I hope this message finds you well. I am reaching out to seek clarification on several aspects of manufacturing within Business Central that are critical to our operations.
2. Routing Specifications: In the routing setup, there is an option to specify either a machine center or a work center. Could you please guide me on how to accurately specify these since they are interconnected? This confusion could potentially lead to inaccuracies in load assessments and report generation.
3. Function of Routing Link: Additionally, I would appreciate an explanation of the function and significance of a routing link within the system.
4. MRP and MPS Calculations: Lastly, I am interested in comprehending the underlying factors and calculations that determine the Material Requirements Planning (MRP) and Master Production Schedule (MPS) when executing the planning worksheet.