I hope this message finds you well. I am reaching out to seek clarification on several aspects of manufacturing within Business Central that are critical to our operations.
1. Machine Center vs.Work Center Costs: It is common knowledge that a machine center is associated with a work center. However, I would like to understand the distinction between the cost attributed to the machine center and that of the work center, considering their linkage. 2. Routing Specifications: In the routing setup, there is an option to specify either a machine center or a work center. Could you please guide me on how to accurately specify these since they are interconnected? This confusion could potentially lead to inaccuracies in load assessments and report generation. 3. Function ofRouting Link: Additionally, I would appreciate an explanation of the function and significance of a routing link within the system. 4. MRP and MPS Calculations: Lastly, I am interested in comprehending the underlying factors and calculations that determine the Material Requirements Planning (MRP) and Master Production Schedule (MPS) when executing the planning worksheet.
Your insights into these queries would be immensely beneficial. I am grateful for your time and look forward to your valuable responses.