Hi,
The Manufacturing date wasn't set when these batches were put in through upload. It is going to be very time consuming to reset the manu date for each batch and have the rest of the dates calculate based on the manu date.
Is there a way to do this for more than one at a time?
I see this in the Periodic section -> Batches for Best before, expiry, shelf advice, but not manufacturing date.
Thank you
*This post is locked for comments
I have the same question (0)You can use the Excel Add-in for Microsoft Dynamics AX and change the data of multiple records in the InventBatch table.
To install:
technet.microsoft.com/.../gg731844.aspx
To use:
technet.microsoft.com/.../hh781099.aspx
After you've installed the Excel Add-in: