Not an ideal solution, but I wasnt finding anything else:
Create 6 boards - A1, A2, B1, B2,C1, C2. Make the 'shared' not given to 'everyone'.
Planner 1 gets A1, B2, and C2
Planner 2 gets A2, B1, C2
Planner 3 - A2, B2, C1
You share them through advanced find, but then they could each put their primary all the way to the left, followed by the two secondary boards.
From system admins view the order is A1, B1, C1, then ABC2. Since the planners only get one board with 1 in it, its always their far left view/default.
Unfortunately, this doesn't work.
We have 3 teams, each being each others back up.
Planner 1 is responsible for schedule board A.
Planner 2 is responsible for schedule board B.
Planner 3 is responsible for schedule board C.
In case planner 1 drags schedule board A to the left, this changes for planners 2 and 3.
In case planner 2 drags schedule board B to the left, this also changes for planners 1 and 3.
In case planner 3 drags schedule board C to the left, this also changes for planners 1 and 2.
So whoever changes last, is having his schedule board as default opening.
Is there a way to fix it, so that
- planner 1 always opens on schedule board A
- planner 2 always opens on schedule board B
- planner 3 always opens on schedule board C
but that they all can still switch to the other schedule boards in case they have to take up their role as a back-up?
Drag it to the left, should default it for you.
I think you have to go to the schedule baord and drag and drop your schedule board tab to the far left so its first in the list. Then it should always default to that scheudle board