
In some documentation it says that if a budget model shall be used for budget control then the budget model can't contain sub budget models.
Is this (correct and) still the case with R3?
Why this limitation except for the reason it hasn't been enabled (coded) to look through the hierarchy ?
*This post is locked for comments
I have the same question (0)