HI,
The user by mistake clicked on the finalize button on Po in Ax 2012. The status of the PO is now Finalize and line are Invoiced/
If i want to revert the changes back, what should be done. IN case if I write a job what table will be impacted if i need to revert the changes and set the status back to confirmed
Regards