In my installation I have two costing versions.
A planned cost version called AVG
A Standard cost version called STD
In the calculation tab of the costing version setup form there is a parameter called
Cost price model that can have two different values:
Calculation group (is the setting for the AVG cost version)
Version cost price (is the setting for the STD cost version)
What is the difference between the two?
Thanks