Product cost problem

(0) ShareShare
ReportReport
Posted on by 452

Hi,

I encounter an issue below

1. I recently ended a production order. Suppose the raw material cost + route suppose to sum up to a amount of 7,497.80 but wonder why the system show me the total cost of 14,995.60. I wonder where the figure came from.

costing-1.jpg

2. I checked the voucher transaction for the product costing, i realize there was a amount of 7,497.80 was posted to a rounding different. Wonder how it happened and what is the logic behind.

costing-2.png

Can any of you guide me how do i trace? Appreciate so much.

*This post is locked for comments

I have the same question (0)
  • Ludwig Reinhard Profile Picture
    Microsoft Employee on at

    Hi Dexin,

    What AX2012 version do you run (R2/3 CU7/8...)?

    Have you already checked LCS for an available hotfix?

    Best regards,

    Ludwig

  • Suggested answer
    guk1964 Profile Picture
    10,888 on at

    It seems to be double the expected cost.

    Rounding is a parameter on the BOM  to deal with fixed cost. i.e .the system needs to know the fixed cost for how many if you set the fixed cost for 10000 and then only make 10  it will give a totally different result  for the unit cost.

    It also depends on whether you cost on the report as finished parameter on the Production order or on the total order quantity.

  • Dexin Profile Picture
    452 on at

    I am using the CU8 version

  • Dexin Profile Picture
    452 on at

    Could you please guide how to check which form should I go in to

  • Ludwig Reinhard Profile Picture
    Microsoft Employee on at

    Hi Dexin,

    Do you use Standard costing or an actual costing method, such as Fifo, Lifo, etc.

    Do you know whether this is the first time this issue occured or whether there have been such big rounding differences before?

    For how many pcs. was the production order startet and how much pcs. were specified when ending the production?

    Best regards,

    Ludwig

  • Dexin Profile Picture
    452 on at

    This is the firs time i encounter this issue. I am using standard cost, i started qty of 2450 ended 2450 but in between i did change my stand cost price for 1 of my raw material...that changes suppose to adjust 93.60 in total only

  • Suggested answer
    Community Member Profile Picture
    on at

    Hi Dexin,

    Go back to your works order and from top action pane select View - Price calculation (tab - overview costing). From there you will be able to see where the costs are coming from(Estimated & Actual costs). It could be over booked labor hour/qty & wrong resources selected for posting, therefore you will have to check your route card journal postings and correct them if needed.

    Hope that helps

    V

  • Suggested answer
    Ludwig Reinhard Profile Picture
    Microsoft Employee on at

    Hi Dexin,

    In addition, Please have a look at the price variances and the sources of those variances through the price calculation form V mentioned.

    ppv.png

    The print button allows you printing a very detailed breakdown of those variances that might help you identifying where the variance comes from.

    Best regards,

    Ludwig

  • Dexin Profile Picture
    452 on at

    Thanks for valued comments.

    I checked the variances rim the price calculation. I saw just a different of 431.80 from the standard cost variance.

    variance.jpg

  • Suggested answer
    guk1964 Profile Picture
    10,888 on at

    With std the sum of component costs going into wip  should = the std of the finished product that comes out of wip - any difference goes to variance.

    If you have changed one of the input costs, without updating the parent BOM cost, or not until after the Production order estimate, then the outcome is a variance between the production estimate and the standard.

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Neeraj Kumar – Community Spotlight

We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Martin Dráb Profile Picture

Martin Dráb 4 Most Valuable Professional

#1
Priya_K Profile Picture

Priya_K 4

#3
MyDynamicsNAV Profile Picture

MyDynamicsNAV 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans