Hi,
I encounter an issue below
1. I recently ended a production order. Suppose the raw material cost + route suppose to sum up to a amount of 7,497.80 but wonder why the system show me the total cost of 14,995.60. I wonder where the figure came from.

2. I checked the voucher transaction for the product costing, i realize there was a amount of 7,497.80 was posted to a rounding different. Wonder how it happened and what is the logic behind.

Can any of you guide me how do i trace? Appreciate so much.