Hi, I have a recurrent issue while planning with Safety Stock in an item.
The story is an item which is replenished by Production Order, Reorder Policy Lot by Lot. It has a Safety Stock of 10, and Inventory right now is 0.
If I plan this item, I will get an emergency Production order for 10 which is right.
Lets say I execute this action message and I get a Planning Prod. Order for this item.
Now, our man in charge of the factory determines he cannot produce this item until next week, so he changes its Due Date and replans it. The order is now expected to be finished next week (lets suppose its running time is just 1 hour in order to simplify this example).
Now, when I run the planning sheet again, I get a new order to fulfill my Safety Stock, since the initial one has been re-planned for next week.
My question is: Is there any parameter I can use in this item to check if in a future period [this is the date formula parameter i am looking for] is going to be produced so I do not get a new production order?
I have checked dampened period parameter, but it seems not to work (I guess it works only backwards)
Thank you
*This post is locked for comments
I have the same question (0)I reply to myself after gathering info from other sources...
I have figured out just lowering a lot Safety Stock to minimums and start using Fixed Quantity as reorder policy. My reordering point and order quantity would be the original Safety Stock.
Seems like this way I can link this demand with future supplies through Time Bucket, so if reorder point flashes up, and my plant release the order for being made next week (inside Time Bucket), the planning system would give me a break... :-)