I got a strange "Vendor is not specified" error when I estimate a production order that has a BOM line with a Pegged Supply item.
Production order is for Item AAA, which uses BBB Item that is also needed to be manufactured.
So, while configuring BOM of AAA, I chose Pegged Supply for Item type for BBB.
Strange thing is that the Item Line Type Icon of the BOM line overview grid shows this BBB item is a purchased item.
But BBB's Production Type in the Item mater is set to BOM.
What could be the root cause of the problem?