On PO where the item UofM has a package quantity (PK100) and it is tied to a Project, it receives 1 EA (instead of 100 EA) as soon as you post the receipt.
It also multiplies the Originating Invoice Cost in Item Vendor Maintenance by the package quantity.
This does not happen on PO without a Project assigned.
Thanks.
*This post is locked for comments