Single Work Order: Multiple Assets (Same Functional Location, Different Asset IDs)

(0) ShareShare
ReportReport
Posted on by 10

Module: Dynamics 365 Supply Chain Management – Asset Management

Scenario:
I have a biannual preventive maintenance task that covers 4 separate assets — 2 mixer/kneader screws and 2 extruder screws — all within the same functional location (Press section) on one production line. They're maintained together in a single maintenance window/campaign.

Each of the 4 components has its own distinct Asset ID, but they share the same Functional Location.

What I'm trying to do:
Raise one work order covering all 4 assets (e.g., as 4 separate lines within the work order), rather than creating 4 separate work orders for what is really one maintenance event.

What I've found so far:
Looking at sample work orders already generated at our site, each work order line does have its own Asset ID field, which suggests this should be possible. But I haven't been able to confirm:

  1. Whether a maintenance plan can be configured to generate one work order with multiple asset lines, or whether plans are inherently tied to a single asset (generating one work order per asset by default).

  2. If it's not supported via a maintenance plan, can multiple asset lines be added manually to a single work order after creation, and does checklist/task tracking still work correctly per line?

  3. Any implications for cost tracking, downtime reporting, or maintenance history if 4 assets are grouped under one work order instead of kept separate.

Has anyone set up a similar "multi-asset, one functional location, one work order" structure? Would appreciate guidance on the correct configuration (maintenance plan setup, work order template, or manual line entry) to achieve this.

i have attached a sample work order for CLIT task which i have created before.
Thanks in advance!

Categories:
I have the same question (0)

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Season of Sharing Community Challenge Winners!

Congratulations to our community stars!

Women in Power Builds Momentum

Expanding mentorship, skilling, and AI innovation

Congratulations to the June Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Finance | Project Operations, Human Resources, AX, GP, SL

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 316 Super User 2026 Season 1

#2
Martin Dráb Profile Picture

Martin Dráb 310 Most Valuable Professional

#3
Anton Venter Profile Picture

Anton Venter 275 Super User 2026 Season 1

Last 30 days Overall leaderboard

Product updates

Dynamics 365 release plans