I am trying to set up a business flow for PO receiving that is comprised of two steps. A user will unload a truck and move material to one of three "staging" locations (user decides which one). After the truck is emptied, or at a later time, the user will take the material from the staging area and put it in a directed location.
From what I can tell, the regular Advanced Warehouse receipt will put the material in a warehouse default location with no ability to override and then pick from that location and put in its' directed location.
I know on the sales side I can combine a pick with two puts to go from stock to dock to truck. Is there any logic similar to this on the PO side or would this require a pick/put to stage 1-3 and then a transfer pick/put from stage to a directed location?
Any help would be appreciated -
Dan
*This post is locked for comments