
Hi,
I have posted an incorrect amount to a Fixed Asset from a job through the job WIP assets function/FA GL journal. Is there any way to reverse the cost off the asset back to the job itself rather than just to the general ledger account? I need the cost on the job so that it can be allocated to the correct fixed asset number.
TIA
Kelly
*This post is locked for comments
I have the same question (0)