Dear everyone.
In Production control module, if the posting date of Route card/Job card/Picking list or RAF is after ending date, system will throw a error and prevent user from ending production order
I checked the code and I can unblock the date validation when ending production order. I already revert the Picking list lines/ Route card lines which is wrong posting date before ending. Therefore, the costing and ledger is still correct.
I want to ask that is there any other impact in this situation.
Do you ever try to unblock date validation to ending production order? Or is there any solution to solve when we post wrong posting date.
Thanks you very much
*This post is locked for comments