How would I go about finding a user group in Niles, Michigan. or within an hour drive. I would like to see how scheduling is done through AX, and capacity scheduling. Current my company does not utilize this part of AX and I want to see the system run. I have used BPCS before and I understand the time that can be saved in scheduling using MRP/CRP.
Thanks;
*This post is locked for comments
I have the same question (0)