Hi all,
I can combine a number sequence with fiscal calendar period if select scope "Company and Fiscal calendar period" but no link between number sequence and current fiscal period. Is there any way to control number sequence with current fiscal period.
Thanks in advance!
*This post is locked for comments
I have the same question (0)

Report
All responses (
Answers (