Hello:
This GP 10.0 Manufacturing client and I have been testing the linking of lot-numbered components and lot-numbered finished goods. This is the process that is "created" in GP, upon checking the box for "Manually select serial/lot numbers in Quick MO".
There is one issue that they have with this process.
They want the finished good to have the same lot number as the component. I did ask them if they are sure that their finished goods will only have one component containing a lot number. They are going to get back to me on that one.
But, let's say that they do have just the one component having a lot number per finished good. Microsoft says that there is not a way to have that lot number automatically tie to the finished good. Is there anyone out there who has created a tool that would do this?
You see, the Manufacturing Lot Number Entry window for the finished good window automatically opens after the window for pulling the component and its lot number. They don't want to have to remember the component's lot number for the finished good in the Manufacturing Lot Number Entry window.
Thanks!
John
*This post is locked for comments
I have the same question (0)