Hello,
I hope to explain this situation correctly but I wanted to know how we can track an item through production using the complete part qty ( 1 part= 100 die) but explode the BOM (or part) to all the 100 die level (reduced per some scape) upon selling to the customer. Basically, the customer is purchasing at the die level but we want production at the part level.
I don't need a complete solution but someone to steer me in the right direction. We also have the hi-tech module but want to remove the module in the future and make the process simpler.