Hi guys,
I'm new to SL customization and I need help from the experts on this community.
I've have WO Qty Required called from subassembly (Build Only) remains unchanged once the Current Qty (Qty to Build) has been revised. While some component
recalculated as per normal based on revised Current Qty.
Scenario:
A Work Order is created with two subassembly: BOM: 0Retro24 & BOM: ORAssembly with Current Quantity = 1. Revised the Current Quantity = 2.
The WO Qty Required of those components subassembly BOM: 0Retro24 recalculated by times 2 while for WO Qty Required of components subassembly BOM: ORAssembly remains unchanged.
Is the recalculation is what the Dynamics SL intended or is this bug?
Thanks,
Regards,
Farez