We have a number of different statuses that our contacts progress through within our marketing funnel, some of which overlap with each other.
I've already created an "Engagement History" table that records changes in these statuses. However, a grid is not a very good way to represent this information to the user.
What I'd love is someway to display these statuses as blocks of time, stacked on top of each other when overlapping.
However, I'd love any recommendation for displaying a table like this in an understandable way! TIA!
Hi,
You can use below pcf controls to get an idea about design.
1. Status Reason Kanban
https://pcf.gallery/status-reason-kanban/
2. Contact Cards
https://pcf.gallery/contact-cards/
if you combine both design then we will have Kanban design + Contact Cards as follows:
Reference taken from below link for more control refer the same
https://pcf.gallery/
Thanks,
Pradeep.
Please mark this as VERIFIED if it helps
Hamza H
141
Daniyal Khaleel
132
DAnny3211
130