I have run into a conflict when trying to use FIFO date control on an item model group when an item is WMS enabled. Below is the error message we are getting:
"One or more items associated with this Item model group are controlled by processes defined for warehouse management and the use of reservation hierarchy. FIFO date-controlled reservations will not be used for these items."
The client requires that costs of raw materials be attributed to the cost of the finished good item on a FIFO or 'layered' basis. So for example, we purchase 100 units at $1.00/each today and 100 units at $2.00/each tomorrow. This item goes into a produced FG, which we make on day 3. If the production consumes 100 units, it will consume the first batch but at a cost of $1.50/each. The client wants it to consume the first batch at a cost of $1.00/each.
We also require WMS enabled items, which in turn require a reservation hierarchy, and it appears that these cannot work in conjunction with each other. The client is on AX7, but it appears from digging around that this is also the case in 2012. Has anyone run into this and/or know of a way around it without a customization?
*This post is locked for comments
I have the same question (0)