Hi,
There seems to be a restriction in cost calculation of Costing Type Standard Cost in AX. The explosion only happens for level 1 ignoring any level below that if the Line Type on the BOM is either 'Item' or 'Pegged supply'. Since ours is a manufacturing company with more than 10 levels of BOMs and not all of them are Phantom, AX 2012 forces us always search for all the Pegged Supply or Item Type BOM line items at different levels with respect to a top level Item and roll up the cost separately for them. Once that goes through fine, only then we will be able to roll up the Top level item. This is an extremely exhaustive process and one that does not make sense at all. Is this how the system designed? If yes, then does anyone have any workarounds or suggested customizations to allow us to Roll up the BOM cost once for all Line types in a Top level BOM? Also, I think this is extremely restrictive from Microsoft especially in an organization where there are numerous BOM changes which will never result in accurate costing for any given Top level Item. I know that running Planned cost does a complete Multilevel calculation but unfortunately that cannot be activated if the Item model group is Standard Cost.
Thanks
*This post is locked for comments