I have set the operations of the route to take as a resource requirement a resource group, I have several resources in this groups that sholud be converted into jobs for that I hahve set the resource quantity to match the number of resources within the group. I can estimate and release the production and I can see that all jobs are schedule as wished, but when I go to the job regsitration and clock in as a worker the grid only shows one of the jobs (the last one in the resource group). Here are some pictures:



Any thoughts why this is happening?