How it can be system feed me back in wip report the time and material projects , only fixed price hit the wip report why not TM also
*This post is locked for comments
How it can be system feed me back in wip report the time and material projects , only fixed price hit the wip report why not TM also
*This post is locked for comments
Good Morning mhmd,
You can also post accruals if you are working with T&M projects.
The only thing required is activating the accrual parameters in the project groups.
Here is an example from D365FO (In AX2012 the same parameters are available)
Best regards,
Ludwig
André Arnaud de Cal...
292,516
Super User 2025 Season 1
Martin Dráb
231,317
Most Valuable Professional
nmaenpaa
101,156