I am trying to get the BOM costing to calculate properly, and I am having issues with one of my secondary operations. I have a press that runs for 70 hours and manual labor that is needed only for 35 hours. The direct labor is the secondary operation, and I set its run time to be 35 hours. When I run the BOM calculation, my secondary operation is calculated for 70 hours instead of 35 - which then also throws off my overhead because it is manual labor dependent. I want my secondary operation to be calculated for the 35 hours, not the 70 hours that was depicted for the primary operation of running the press.
Is there a way to fix my problem? Or do I need to have two separate primary operations? We would really prefer to have these operations run in parallel with eachother as primary and secondary operations.