Hi,
I need to use the current on hand to cover the safety stock before covering the demand forecast.
I have the following scenario:
Item X
Onhand: 1 qty
Safety Stock: 1 qty
Demand Forecast: 4 qty
in each time I run master plan, it gives me 1 planned order with 4 qty with the below requirements:
Demand forecast: 3 qty
Safety stock: 1 qty
actually what I need is 1 planned order with 4 qty but with the below requirement:
Demand forecast: 4 qty
thanks