Capacity of resource, resource group

(1) ShareShare
ReportReport
Posted on by 6
Hello, 
I have below case. I need to setup production where for first step is prepare semi product in tanks (200l capacity one), one tank = one resource. 
All tanks 5 pcs = is one resource group. 
Operation time to prepare one tank to next operation 3h.
Secound operation is packing = one resource , (its ok no issue) 
I was set up resource, resource group. 
For first operation I was add resource group ( this resource group have 5 resources( tanks)) and I divided resource group on 5.
 
 
But when I start planning system is plan for all resources the same quantity (quantity to produce not divided to 5).
 
 
How to set up sytem  to work in fowing case:
- 3 tanks, system used resiurce for first 3 taks not use rest tanks for the same production.
- 5 tanks system use all resiurce for goroup,
- 8 tanks system use 5 tanks on first 3h, and 3 tanks on secound 3h
 
so I need to set up capacity for resource for one tank , but i need to use, load this resource on several times in production time. how ?
 

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Congratulations 2024 Spotlight Honorees

Kudos to all of our 2024 community stars! 🎉

Meet the Top 10 leaders for December

Congratulations to our December super stars! 🥳

Start Your Super User Journey Pt 2

Join the ranks of our community heros! 🦹

Leaderboard

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 291,791 Super User 2024 Season 2

#2
Martin Dráb Profile Picture

Martin Dráb 230,488 Most Valuable Professional

#3
nmaenpaa Profile Picture

nmaenpaa 101,156

Leaderboard

Featured topics

Product updates

Dynamics 365 release plans