Hello all,
I use costing method is weight avg. I purchase raw material (B01.01) and invoice it.
When I estimated production order, cost of raw material still equal 0.
Do I have any wrong setup?
By the way, D01.01 is semi product of D01. In the first production order in system, after I estimated production order, cost of D01.01 does not show. Cost of D01.01 only show if I end production order of Item before. Does that way system operate?
Please help me.
Thank you.
Phung Luong.
*This post is locked for comments