Dears,
I want to create shipment and add those shipment to a particular load in my inbound process manually. And track my load till the receiving (Product Receipt) end.
My scenario is :
1. Create purchase orders
2. Receive materials at the hub. (Not physical receive (Product Receipt))
3. Create shipments for the items received by the forwarder (Carrier) to ship to PO warehouse address attached in the purchase order.
4. Add shipments to a load(Container).
5. Add charges to the load(Container).
6. Receive the container(Load).
7. Receive the material physically into the ware house attached to the PO.
Can I do this process in Dynamics AX 2012 R3. Please suggest.
Regards,
Prashant Kumar
*This post is locked for comments
I have the same question (0)