Hi All,
i got above error "Calculation group must be specified for the item" when i calculate the cost for item, but i cannot find where i can assign the group for the item.
Thanks.
*This post is locked for comments
Hi All,
i got above error "Calculation group must be specified for the item" when i calculate the cost for item, but i cannot find where i can assign the group for the item.
Thanks.
*This post is locked for comments
Thanks ton :)
You can find Calculation group over here in Released product details form
Under Engineer fast tab,
Please verify if this solves your problem.
Hi, it's in the Engineer fast tab on the item master (Released products). If it's blank on the item, the system uses the Calculation group on the Inventory and warehouse management parameters Bills of materials tab.
André Arnaud de Cal... 291,391 Super User 2024 Season 2
Martin Dráb 230,445 Most Valuable Professional
nmaenpaa 101,156