Well, I have uploaded my AX2012 ModelStore file for code analysis and upgrade to AX7.
I have got a question here, Can I close LCS website or my machine, during code analysis or that has to be open as must? In other words is it must that LCS site should be open all the time during upgrade process (code analysis).
I haven’t got any documented answer yet by Microsoft. But my personal observation says it should work, without my presence, because I have given it what it needs (it needs 2012 model store file, that I have given it already, so my presence(LCS Site Open) should not matter).
*This post is locked for comments
I have the same question (0)