How can I add set up costs (labor, Overhead) for each of the machines in our production process? some machines have different set up time and number of people preparing the machine for running. We do not want to use the set up cost category in the operation as it makes the set up cost show up in price charges. We do not want to change all the BOMs to include a service item that holds the fixed cost. We want this set up cost to be included in the price of the item. So, if the standard cost of an item we produce now is $1.50/piece and the set up cost for one of the machines in our process is $10 Labor , $20 fixed overhead, and $10 Variable overhead, then we want the standard cost to show for an order of 1,000 : $1.50 + ((10+20+10)/1,000)= $1.54/piece. Thanks.