Hi,
We have problems when trying to cancel a packing slip connected to Item requirement (from Project) in D356 FO.
The new feature /Enable packing slip cancellation for item requirements/ seems helpful but doesn't work as expected.
When we run Cancel packing slip (from the Load) nothing happens.
Any parameter we need to change or any setup that could be missing?
Grateful for tips!