Assigning a Resource to a Work Order

(0) ShareShare
ReportReport
Posted on by 670

Hi.

I want to assign a Resource to a Work Order, but without a date so the resource can schedule it themselves and create a booking. It's easy enough to create a custom field on teh WO to store the resource.

What I would like to do though is to use the inbuilt logic to present me with a list of engineers who match based on skills, territory and  preferred engineer(not mandatory) like Quick schedule but without the time slots. Any suggestions?

I have the same question (0)
  • Lucky Dog Profile Picture
    670 on at
    RE: Assigning a Resource to a Work Order

    Gabriel - Hi. Thanks for this. Using Ownership as you suggest would work. I am not certain how it will affect other users yet if  I need to configure security for this. In the meantime I have come up with another variation of your solution which also works and has the advantage of using the scheduler to suggest suitable resources. I have set the default scheduled booking status for the scheduler to a new booking status of 'Assigned' and created a new Bookings view on mobile where the engineer can see the Assigend bookings which they need to change by correcting the date and  setting the status to' Scheduled'.   I think this makes it easy for the resource.

  • Lucky Dog Profile Picture
    670 on at
    RE: Assigning a Resource to a Work Order

    Rocky - Hi. Thanks for this. Using Ownership as you suggest would work. I am not certain how it will affect other users yet if  I need to configure security for this. In the meantime I have come up with another solution which also works and has the advantage of using the scheduler to suggest suitable resources. I have set the default scheduled booking status for teh scheduler to a new booking status of 'Assigned' and created a new Bookings view on mobile where the engineer can see the Assigend bookings which they need to change by correcting the date and  setting the status to' Scheduled'.  Ithink this makes it easy for the resource.

  • Verified answer
    Gabriel Dias Junckes Profile Picture
    2,428 on at
    RE: Assigning a Resource to a Work Order

    I have two suggestions:

    - Assign (owner field) the work order to the technician, you can use the work order sub-status to categorize it too. From the mobile app, the technician will need to get those work orders from the schedule list and create a booking themselves. This approach does not let you see the resource availability because the booking is not created.

    - Placeholder booking: From the agreement generation or from a work order scheduling. You can create a booking for the technician and use the priority 'trivial' to identify those 'floating' bookings. It gives the flexibility to your technician and scheduler to move those bookings when they need. You also can see the availability from it.

  • Lucky Dog Profile Picture
    670 on at
    RE: Assigning a Resource to a Work Order

    Gabriel - Hi

    I tried this and realised that it of course uses up the available time and this doesn't fit the process well. The process is such that the office assigns each WO as it comes in to a technician  who will then schedule it themselves into the appropriate slot they decide upon. This means the booking shouldn't consume available time. Also, to use fulfilment slots this needs to be stored against the Wo and comes again into play when the resource schedules themselves so gets in the way.

    Are you able to think of anything else?

  • Verified answer
    Rocky Pavicevic Profile Picture
    100 on at
    RE: Assigning a Resource to a Work Order

    How about changing Owner of WO to resource, and then having a My Unscheduled WOs view where Owner = current user? Then resource can add booking to WO themselves as it fits their schedule.

  • Suggested answer
    Lucky Dog Profile Picture
    670 on at
    RE: Assigning a Resource to a Work Order

    Good suggestion, I hadn't thought of this and will give it a go. Thanks.

  • Gabriel Dias Junckes Profile Picture
    2,428 on at
    RE: Assigning a Resource to a Work Order

    Hi.

    In order to create a booking, you will need to have a start and end time. You can ignore it if you want.

    How about setting up a large fulfilment slot and enabling quick scheduling?

    docs.microsoft.com/.../set-up-time-groups

    docs.microsoft.com/.../quick-scheduling

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Andrés Arias – Community Spotlight

We are honored to recognize Andrés Arias as our Community Spotlight honoree for…

Leaderboard > Service | Customer Service, Contact Center, Field Service, Guides

#1
Abhilash Warrier Profile Picture

Abhilash Warrier 101 Super User 2025 Season 2

#2
Daniyal Khaleel Profile Picture

Daniyal Khaleel 61

#3
Tom_Gioielli Profile Picture

Tom_Gioielli 26 Super User 2025 Season 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans