Hello All,
I need to know how to change a Posting Date on patching in the waiting stage.
The packing slip has been generated.
Typically I would open the fiscal calendar year and allow the batch to post then instruct the user to credit off and refill with correct Date.
The post date used was 11/30/2012. The FC started in 2015 in D365. The system will only allow me to create a new of 2022 or a new calendar.
I either need to know how to add a prior year to a current fiscal calendar or how to change the posting date to batching in waiting because they cannot post.