Microsoft Dynamics NAV 2009 R2
Version US Dynamics NAV 6.0 SP1 (6.00.33046)
In an unmodified database, CRONUS USA, I’ve set SILVER Location as;
Require Receive = True
Require Put-away = False
Bin Mandatory = True
I enter a purchase order with a Posting Date of 11/1/11. I create a Warehouse Receipt, with a posting date of 11/2/11. I post the Warehouse Receipt (in this case a partial receipt). Afterwards, I notice that Posting Date of my PO is changed automatically to 11/2/11. I also see that the resulting Item Ledger Entry is posted with a posting date of 11/2/11. Up to this point I agree with this behavior.
I realize later that product was also received on 11/1/11 that was not yet posted to NAV. I again create a Warehouse Receipt, this time with a Posting Date of 11/1/11. I post my receipt. This time, all records created from that event have a posting date of 11/2/11 except for the Posted Whse. Receipt (which is 11/1/11). Even the Item Ledger Entry has a Posting Date of 11/2/11.
Am I missing something? It appears that when posting partial receipts, one would need to first confirm the posting date on the purchase order before creating and posting a warehouse receipt? Am I missing something?
*This post is locked for comments