We are still struggling with almost identical job card journals being created by shop floor. To debug this we have added the create and modify fields to the related tables showing where the problem was happening.
This is the scenario we are seeing:
At 9:45:22 A job card journal is created by shop floor with a good quantity of 25 for the operation and no time reported. 12:am to 12:am. This does not post.
At 9:46:02 40 seconds later another job card journal is created with a good quantity of 25 and substantial process time. This does post.
Same operation, same process, same job, same operator. The only differences we can see are the lack of time reported and the journal number (they differ by 4). Both set operation and job completed but do not do a report as finished. If this was posted the operation would have twice the quantity that was actually completed.
Any hints as to what is going on? MES has many hotfixes in R3 and we are at CU8. None of the fixes talk about this problem if they really reference anything. It is as if the code is torn between separating the time and quantity postings but leave them together in one journal and only report the good quantity in another.